About
Connex Group was proud to contribute alongside CGC Group to this significant local infrastructure project by providing structural steel 3D Modelling and 2D shop drawings for the new platform canopies, lift shafts, and underpass screens.
The Connex Structural Engineering team also worked closely with the demolition crew to certify the demolition methodology, ensuring the safe decommissioning and removal of the old Docker Street bridge.
Details
Builder: McConnell Dowell
Steel Fabricator: CPE Construction
Installation & Demo: Concept Rigging
