About
Connex Group were engaged to supply the steelwork fabrication drawings for the Victorian Tunnelling Centre in Holmesglen. Challenges in this project included coordinating with the two full-sized replica tunnels within this centre, the first being a replica Tunnel Boring Machine (TBM) and the other being a replica tunnel created by a Tunnel Boring Machine.
Details
Number of Drawings: 1550
Steel Tonnage: 140