About
Greater Shepparton Secondary College is one of the largest projects to be built by the Victorian School Building Authority. The college comprises three multi-purpose buildings, a gymnasium, an Enterprise and Innovation centre and a number of smaller buildings. Connex played a pivotal role by completing the steel and precast shop drawings for all the buildings involved.
Due to our client’s fast-tracked schedule, Connex was engaged early in the design phase. Working hand in hand with the design team, builder and fabricators, Connex helped ensuring timely and practical outcomes at each project stage. With our experience and in-house structural knowledge, we were able to assist the consultants by proposing design solutions, facilitating swift resolutions to RFI’s.
Details
Category: Construction Modelling & Fabrication Drawings for Steel and Precast
Engineer: Irwinconsult
Architect: Gray puksand
Builder: Hansen Yuncken (Client)
Fabricator: CPE Construction, Steelwork Bendigo & Leed Steel
Pre-caster: Statewide Panels