Wangaratta Christian Fellowship

This project required a site visit and measure to ensure that our new building would continue on from an existing. The challenge for this project was the change in roof pitch between the old and the new and being able to frame out box gutters successfully.

Details:

Total Number of Drawings : 975

Total Tonnage : 28.7

Wangaratta Christian Fellowship 18.05.2015