Rockbank Station

Connex Group were engaged to supply steel for one of the station upgrades along the Ballarat Line. The project consisted of some difficult challenges such as detailing the bent plates for the overpass cladding.

Details:

Number of Drawings: 2303

Steel Tonnage: 191 Tonne