Numurkah Hospital

This building consisted of multiple curved trusses that required significant input hours to complete. The structural steel also needed to be coordinated with concrete panels and existing building on site. Due to the tight construction time frame we were required to break the project up into multiple stages to help the fabricator to meet the deadlines.

Details:

Total Number of Drawings : 5466

Total Tonnage : 133.4

Numurkah Hospital 18.05.2015