Echuca Hospital

This is our largest project to date. The project had significant challenges that the builder needed assistance with including a complete re-design of the stage 2. We were also required to detail a design for the services gantry that ran through the middle of the existing hospital. The gantry needed to be supported by columns that fell within the existing walls of the hospital as well as above and below existing mechanical trusses and roof components.

Details:

Total Number of Drawings : 8908

Total Tonnage : 314.8

Echuca Hosptical 14.05.2015