Bull Street, Bendigo

The challenge with this project was the fact that the majority of the building works were renovations and additions to an existing concrete and structural steel building. We required several site visits and significant site measuring to enable the structural steel to fit first time as detailed.

Details:

Total Number of Drawings : 625

Total Tonnage : 20.9

Bull St. Bendigo 18.05.2015