Alcoa Tower

Alcoa Tower 14.05.2015This Project was a relatively straight forward build with significant time constraints and installation requirements. It was absolutely imperative that all aspects of the build went smoothly on site to ensure that the customer requirements were met.

Details:

Total Number of Drawings : 765

Total Tonnage : 76.1