The challenge with this project was coordination between site and the fabricator to ensure that all cast components matched the structural steel for erection. The building also required a tight vehicle access ramp to the basement. This ramp needed to site measured and detailed to ensure that relevant standards and architectural design intent was met.
Details:
Total Number of Drawings : 921
Total Tonnage : 39.1